Cooling & Power Layout Review
From â‚©360,000 per review
When to book
Before you sign a hardware order or lease expansion—especially when adding a row of 0.05+ PH/s units to an existing hall where summer derating already appears on your logs.
What we examine
- Intake and exhaust paths, including accidental recirculation
- Breaker panel capacity versus planned unit count
- Hot aisle / cold aisle discipline (or honest assessment if informal)
- Ceiling height and duct clearance for top-mounted exhaust
- Floor loading for stacked or dense configurations
Output
Annotated floor plan PDF with colour-coded risk areas, a breaker allocation table, and a short narrative on whether your target unit count fits without immediate electrical work.
Limitations
We do not perform electrical installation or structural engineering sign-off. Findings are advisory for your licensed contractors.
Next step
Schedule a layout review with a sketch or CAD export and your planned unit list.