Cooling & Power Layout Review

When to book

Before you sign a hardware order or lease expansion—especially when adding a row of 0.05+ PH/s units to an existing hall where summer derating already appears on your logs.

What we examine

  • Intake and exhaust paths, including accidental recirculation
  • Breaker panel capacity versus planned unit count
  • Hot aisle / cold aisle discipline (or honest assessment if informal)
  • Ceiling height and duct clearance for top-mounted exhaust
  • Floor loading for stacked or dense configurations

Output

Annotated floor plan PDF with colour-coded risk areas, a breaker allocation table, and a short narrative on whether your target unit count fits without immediate electrical work.

Limitations

We do not perform electrical installation or structural engineering sign-off. Findings are advisory for your licensed contractors.

Next step

Schedule a layout review with a sketch or CAD export and your planned unit list.